Arizona's Premier Foundation Repair Contractor
Saving a Foundation Catastrophe part III
Raising a Sunken 300,000sf. Industrial Building 15”
As we started the pre drilling process, we drilled down to 60 feet, the depth of the solid landfill. Afterward, we would install the push piles and.
Saving a Foundation Catastrophe part I
Raising a Sunken 300,000sf. Industrial Building 15”
We had the opportunity to work on an industrial building that was severely distressed. Several parts of the building had sunk 15”, or more, and are.