Free Initial Foundation Inspections for All Arizona Homeowners

Give us a call to schedule yours: 844-924-8900
BBB
  • Home
  • >> Arizona's Premier Foundation Repair Contractor

Arizona's Premier Foundation Repair Contractor

Heave Protection for Foundations

Heave Protection for Foundations: Recap of the Need for Heave Mitigation

I’d like to give a quick summary of where we are at with the last few blogs...

Moisture problems in slabs on grade

One of the benefits that I brought up earlier of MoistureLevel smart foundation system is the remediation of moisture problems in slabs on grade. How many of you have experienced the difficulty of.

My Interview with Rosie Romero

Arizona's Home Improvement Radio Program

Awhile back, I had the pleasure of being the guest speaker for the Rosie On The House radio show. For those that do not know, the Rosie on the House radio.

Using Sub Slab Depressurization to Mitigate Vapor Transmissions

In a recent blog, we discussed the vexing problem of vapor transmissions through slabs on grade. In my previous post,MoistureLevel system proves cost effective for treating vapor transmission, I.

Why Only Get Half the Solution?

One Size Fixes All Foundation Repair Solutions Are not a Thing

How many people trust taking their car to a company like AAMCO or another transmission repair specialist to diagnose general problems.

The Age of the Structure

Rules of Thumb in Diagnosing Foundation Problems part VII: The Age of the Structure

How old is the structure? There is a lot more to this question than meets the eye…

The Hardest Job of My Life: Part 7 - The Conclusion

"After many months of very hard work the project was completed. This was a marathon of work. Hard physical work..."

- Bob Brown

Finally all of the areas of the house that we were hired to level were.

Lessons Learned From the Hardest Job of My Life

Looking back introspectively on experience of the hardest job of my life as told in my last 7 blogs, I have gleaned the following conclusions from both an operational and life experience point of.

The Hardest Job of My Life: Part 5

In an effort to reach the middle of the slab that was surrounded by grade beams we embarked on excavating a 3 deep tunnel from the west side. From there we could access the area between the grade.

The Hardest Job of My Life: Part 3

The project began in earnest at the end of May, which was ideal as the Sonoran Desert heat had not settles in for the summer just yet. One of our top production foremen, David Ortiz, was assigned to.

Page:
1 2
>>