Arizona's Premier Foundation Repair Contractor
Saving a Catastrophe: Raising a Sunken 300,000sf. Industrial Building 15” pt - III
As we started the pre drilling process, we drilled down to 60 feet, the depth of the solid landfill. Afterward, we would install the push piles and drive them to refusal, as we did not know the.
Saving a Catastrophe: Raising a Sunken 300,000sf. Industrial Building 15” - part II
In my last blog, I described the state of the building when we first encountered it. To review the previous blog entry, click HERE.