Arizona's Premier Foundation Repair Contractor
Remediation of Hotel pt. I
The Remediation of Hotel built on Top of a Landfill - Part I
We have another project (similar to the last tilt up Phoenix warehouse project) that is challenging our technical experts to utilize every.
Saving a Catastrophe: part VI
With the building substantially lifted (less minor adjustments), we focused our attention on the compaction grouting. Much of the same challenges presented themselves similar to the pile.
Saving a Catastrophe part V
After months of more drilling (and more drilling)…. we were finally ready to lift again….. once again a large entourage assembled, but this time we had something to show as we lifted significantly..